Optimization of the Maintenance and Repair System for Freight Wagons Based on Actual Work Scope and Operational Reliability Testing Results
Back to projectsThe project includes an assessment of the effectiveness of a freight wagon maintenance strategy based on Type 2 bogies (in accordance with applicable technical standards), which provides for preventive scheduled current maintenance to be carried out during the inter-repair interval.